Jobs

Geometric Power Nigeria Limited massive recruitment(http://geometricpower.com/vacancies/)


GEOMETRIC POWER is the pioneer in Nigerian Power Industry. We pride ourselves in placing the first Independent Power transmission Station in the country, as well as being one of the first companies involved in urban electrification. In terms of power generation, we brought in the first high efficiency combined
emergency power station in 2001 for Abuja. The 22 MW Emergency Power Station in Abuja guaranteed the Power Holding Company of Nigeria (PHCN) the supply of 15MW. While in operation, the power station successfully supplied uninterrupted power to the Power Holding Company of Nigeria (formerly National Electric Power Authority) to serve a dedicated distribution network within Abuja and its environs.

Geometric Power is an indigenous power developer in Nigeria that is currently seeking the services of highly organised professionals to fill the following vacant positions at the Corporate Head Office and the Aba Integrated Power Plant Project


 How to Apply
Qualified candidates are requested to submit ONLY an electronic application by submitting a Resume along with a Cover letter and fill the electronic form on
http://geometricpower.com/vacancies/ to apply online.

Non-electronic applications will not be considered by our HR Consultant.

Application Deadline: 11pm on December 31st, 2012.

Only shortlisted candidates will be contacted by our HR Consultant