Nigerdock’s
fabrication yard is the standard by which excellence in the industry is
measured. It has delivered on the country’s most important oil &
gas construction projects including Total’s Usan and Akpo fields,
ExxonMobil’s Erha and MIPS projects, Chevron’s Agbami and Escarvos Gas
Projects as well as Shell’s Bonga project.
The company’s capability
includes construction of FPSO topside process modules, offshore
platforms, flares, bridges and has built several of the world’s largest
deepwater SPM buoys. The company is focused on becoming an FPSO topside
integration centre for the industry.
Nigerdock is committed to the highest safety standards in the
industry and has defined and maintained Health, Safety and Environmental
Manuals, Policies and Procedures for all of its operations. The
company’s workforce is consistently trained in the safe working
practices of their individual fields.
The prime function of this role will be to support the development of
a structured, consistent and accurate cost control, reporting and
estimation for a surface facilities project.
Other key responsiblities will be to
- Provide support to individual Project team members in establishing
and maintaining up to date project cost engineering deliverables and
related supporting documents including variance analysis of cost
over/under runs
- Produce deliverables to support PE’s/PM’s by establishment and
maintenance of cost progress S-curves (inclusive of actuals, forecasts,
and commitments) for the on-going project – prepare overall project
summary reports on the same basis
- Produce cost reports and presentations suitable for management
(monthly, quarterly and annually) as required, giving planned, actual
and forecast costs, for on-going project
- Ensure compliance with corporate cost engineering procedures as applied to the project
- Capture and highlight costs resulting from the change control procedure
- Monitor expenditure monthly on a Value of Work Done (VOWD) basis for
the project to produce cost forecasts (latest estimates), to provide
timely notification of potential over/under-runs against approved
budgets
- Produce monthly/quarterly/annual variance and trend analysis
expenditure reports and explain key cost movements with respect to
commitments, actuals (VOWD basis), latest estimates against plan as
agreed with the Project Manager