The point marked N which is the site of hydroelectric pow...
The point marked N which is the site of hydroelectric power project is at the
Gurara Falls
lkerre Gorge
Shiroro Gorge
Kurra Falls
Correct answer is C
No explanation has been provided for this answer.
The length of the major road in Ruwawa is approximately ...
If the temperature at sea level in a particular place is 30°C, a place 350m above sea level in t...
----------- is a type of mass movement or mass wasting ...
The growth of NONSO settlement is probably because ...
The greatest hydro-electricity potential in Nigeria is found in the ...
The benefits to be derived by ECOWAS member countries include all the following except ...