Economics questions and answers to help you prepare for JAMB, WAEC, NECO, Post UTME and job aptitude tests or interviews.
Changing the structure of a commodity in order to increase its utility is called?
Time utility
Form utility
Marginal utility
Place utility
Correct answer is B
Form utility refers to the change in the form or structure of a commodity during its manufacturing process in other to increase its utility. For example, a change in the form of raw cotton to clothing material. Cotton in its raw form does not give satisfaction until it is changed to a clothing.
A country's terms of trade can be improved by ____?
Collective bargaining
Imposing lower export duties
Revelation of currency
Reducing demand for imported goods
Correct answer is B
Tariffs are taxes or duties imposed on imports and exports by the government of a country. The idea behind tariffs is to restrict the volume of trade or improve the international terms of trade.
Given that Qd = 10 - 2p while Qs = 5 + 3P, if P = N 1 determine the equilibrium quantity.
7
6
5
8
Correct answer is D
To get equilibrium price and quantity:
i) Get function solved for Qs and Qd (quantity supplied) and Qd (quantity demanded)
ii) Set Qs equal to Qd
iii) Solve for P (equilibrium price)
iv) Plug your P back into your Qs and Qd function to get the quantity.
when, Qd = 10 − 2p and Qs = 5 + 3p
if Qd = Qs then,
10 − 2p = 5 + 3p
solving for p: 10 − 5 = 3p + 2p
5 = 5p
p = 1 (given in the equation)
Equilibrium Quantity will be gotten by plugging P into Qd and Qs respectively;
If P = 1
Qd = 10 − 2p Qs = 5 + 2p
= 10 − 2(1) = 5 + 3(1)
= 10 − 2 = 5 + 3
= 8
Which of the following is NOT an instrument in the money market?
Treasury bill
Bill of exchange
Stocks and shares
Call money fund
Correct answer is C
Stocks and shares are securities purchase by individuals, which is evidence of contributing part of the total capital used in running an existing industry. Stocks and shares are instruments used in capital market.
20
13
15
10
Correct answer is C
In this case, 4 workers produce 60kg of output therefore, the Average product of labour for the 3rd unit is 15kg. Given by:
Average product = Total product/Variable product
= 60/4
= 15kg