Jobs

Site Foreman at Still Earth Construction and Realty


Still Earth Construction and Realty is a premier general contractor highly regarded as one of the leading engineering & construction companies in Nigeria with a portfolio of completed projects and satisfied clients that are in both the public and private sectors.

We are recruiting to fill the position below:

 

 



Job Title: Site Foreman

Location: Ikoyi, Lagos
Employment Type: Full-time

Job Summary

  • To coordinate operations and oversee workers at construction sites and be the key component for completion of projects.
  • To be the point of reference of both workers and supervisors. To exhibit leadership and experience in direction of workers by making quick, well organized, and safe decisions.

Key Responsibilities

  • Responsible for supervision of Brick Construction, Façade, Window & Insulation Install, Roof Weathering, and Finishes
  • Manage scaffolding, loading bays, and materials
  • Check and understand all drawings and specifications.
  • Report any errors / omissions to the Project Manager and Site Manager
  • Setout works schedules, Supervise, coordinate, and work with the site Engineer allocated to the project
  • Oversee the setting out of the works – window install
  • Supervise direct / indirect workers allocated or engaged with the works
  • Supervise, coordinate, and monitor sub-contractor performance
  • Review and monitoring of work to programme schedule
  • Execute work to deadlines
  • Review RAMS for the works in hand
  • Coordinate cranes, deliveries, and logistics on site
  • Ensure compliance with drawings, specifications, building regulations and good building practice, structural & building tolerance
  • Ensure compliance with the company’s quality procedures.
  • Carry out / attend white board / coordination meetings
  • Monitor cube making / slump test, monitor cube strength
  • Responsible for Maintaining a tidy, safe site / work areas, in compliance with health & safety guidelines/standards
  • Liaising with the client and design team in a professional manner when required.
  • Supervision of the construction on site
  • Maintaining site diary – recording manpower levels for each sub-contractor and keeping detailed notes of all site activities
  • Manage and coordinate both site staff and sub-contractors on site
  • Ensure work is carried out to the highest of standards.
  • Signing off and inspections of fit out works

Additional /Site Responsibilities:

  • Recognize, report, and/or correct unsafe conditions on the job site.
  • Ensure the organization and availability of all tools and materials needed for the current day’s work as well as planning for tomorrow. Load and unload trucks as required.
  • Inspect all tools and equipment to ensure safe operation; must have knowledge of how to properly and safely use different equipment, such as power tools, hand tools, vibrators etc.
  • Direct and perform the installation or dismantling of concrete forms as needed.
  • Ensure that necessary measures are taken to protect adjacent surfaces and structures from splatters, damage, etc during concrete placement.
  • Recognize the slump of concrete and proper mixes for different application
  • Ensure that the finish floor grade is established and met during concrete placement using lasers, grade stakes or other methods. Grade may be flat or on a slope at any given point
  • Use and care of hand tools associated with flatwork placement and finishing. Includes, but not limited to: rakes, screeds, magnesium floats, steel trowels, wood floats, bull floats, edgers, jointers, finishing brooms, etc.
  • Use and care of power tools such as lasers, circular saws, cordless tools, etc. Operate power screeds, such as basic vibrating screeds or walk behind laser screeds and power rakes.
  • Operate power trowels, both walk-behind and ride-on trowels, while equipped with different attachments such as float pans, float blades and finishing blades.
  • Ensure that the correct steps necessary to obtain the specified & required finish for the job are followed.
  • Ensure that all control joints are laid out and properly installed per the plan, both hand-tooled and sawn joints.
  • Understand different sealers, hardeners, and floor curing methods and the proper way to install each method.
  • Manage and coordinate trade sub-contractors on site
  • Ensuring work is carried out in accordance with specification and programme
  • Responsible for onsite Health and Safety
  • Attending weekly site meetings
  • Proven leadership skills with a large and diverse workforce
  • Excellent analytic problem-solving and troubleshooting skills
  • Monitoring work progress in line with set deadlines, ensuring compliance with set deadlines and project finish dates.
  • Report on progress to project manager, engineers, executive management etc
  • Plan weekly/monthly work in steel fixing and formwork teams
  • Calculation of concrete and rebar quantities on daily and weekly basis and to plan for deadlines

Administrative:

  • Coordinate with finishing project manager closely and instruct each crew member in their responsibilities for the day and for the pour.
  • Manage all direct reports in items such as attendance issues, time off requests, etc.
  • Work closely with the finishing project manager to learn budgets & manhours for each assigned job; manage crews and resources accurately and fairly as needed to improve or maintain the budgeted costs.
  • Report all near misses, incidents, or accidents to the job site supervisor. This is critical in the improvement of our safety culture.
  • Ensure that the daily pre-task plan is done before beginning any work each day. Conduct and document the weekly toolbox talks.
  • Promptly report any and all mechanical problems with equipment or vehicles as well as any needed supplies for the job site.
  • Perform, or assist with, the documentation of any employee issues and problems, including employee evaluations, disciplinary actions, good behaviour documentation, etc.
  • Train and guide each direct report in the proper aspects of finishing and concrete flatwork in order to consistently produce safe and quality flatwork products.

Qualification & Experience

  • OND, HND, BSc or Equivalent Technical College
  • Minimum of 10 years of combined Building technology/Civil Engineering works
  • Must have worked on large-scale building projects previously
  • Experience in organizing labour and sub-contractors
  • 5 years’ experience in a foreman’s position
  • Team player
  • Previous experience as finishing foreman on a commercial and residential projects
  • Site supervision experience with a trades test certification.
  • Ability to read and understand construction drawings.
  • Knowledge of latest building regulations and certification standards.
  • A strong sense of ownership and responsibility for tasks/projects
  • Computer literate
  • Usage of IT/Gadgets on site.

Competencies Required:

  • Qualified trade background
  • 4+ years’ experience in managerial or supervisory roles, working on a mix of projects
  • Up to date with current building regulations
  • Strong IT skills
  • Understanding of program of schedule of works
  • Understanding of technical details about construction of civil work and road works
  • Understanding of producing Civil & Road works to specific standards as per design
  • Strong personality and understand local labour ie steel fixers and carpenter
  • Excellent written and communication skills.
  • The ability to lead, use initiative and be self-motivated
  • Pro-active approach
  • The ability to multi-task and manage many priorities
  • Degree in Building technology/ Civil or relevant work experience.
  • Excellent written and communication skills
  • Must have experience with a main contractor.
  • Commercial Awareness
  • Strong knowledge and background in Building projects, and interior.
  • Strong ability to communicate in proper and fluent written and spoken English
  • A strong sense of professional, organizational & leadership skills

 

 

How to Apply
Interested and qualified candidates should forward their CV to: [email protected] using "Application as a Site Foreman" as the subject of the email.

 

Application Deadline 15th July, 2023.