A plank is placed along the path on which a wheel barrow ...
A plank is placed along the path on which a wheel barrow containing sand is pushed at a construction site to prevent it from sticking as illustrated in the diagram given. The large area of the plank prevents the wheel barrow from getting stuck by
increasing the reaction on the ground
increasing the pressure on the ground
decreasing the pressure on the ground
decreasing the weight on the ground
Correct answer is C
No explanation has been provided for this answer.
Which of the following is most strongly deflected by magnetic field? ...
If an object just begins to slide on a surface inclined at 30º to the horizontal,the coeff...
The bond that forms a semiconductor is? ...
Which of the following is used as a depolarizer in a Denial cell? ...
The slope of a linear distance-times graph represents ...
In photo-emission, the number of photo-electrons ejected per second depends on the? ...
A gas at pressure PNm−2 and temperature 27°C is heated to 77°C at constant volume. Th...